Rogz Control Bungee Long Lead – Blue, XLarge

$50.99

Keep a lead ready for daily walks in a clear, practical colour and size. This Blue XLarge Rogz Control Bungee Long Lead is supplied as one original lead, ready to pair with a suitable collar or harness.

In stock

Buy this product to earn 46 Points
  • Suitable For Dog
SKU: PA-BPP-15764 Categories: , , Brand:

Description

Keep a lead ready for daily walks in a clear, practical colour and size. This Blue XLarge Rogz Control Bungee Long Lead is supplied as one original lead, ready to pair with a suitable collar or harness.

Features

  • Original Control Bungee Long Lead format
  • Blue colourway
  • XLarge size

Product details

Size XLarge
Colour Blue
Pack 1 original lead
Nominal lead length 1.2m
Webbing width 2.5cm

Suitable For

Dog. Check the fit and condition before every walk. Use this product under supervision and follow its original instructions. A lead, collar, muzzle or harness sold separately is not included unless explicitly stated.

Frequently asked questions

What is included?

1 original lead.

How should I use this product?

Check the fit and condition before every walk. Use this product under supervision and follow its original instructions. A lead, collar, muzzle or harness sold separately is not included unless explicitly stated.

Additional information

Suitable For

Dog

Size

XLarge

Colour

Blue

Pack

1 original lead

Nominal lead length

1.2m

Webbing width

2.5cm

Shipping & Returns Policy | Australia-Wide Delivery | Pets Area

Pets Area delivers Australia-wide! For city-specific shipping inquiries, contact our customer service team. Deliveries are set as “authority to leave,” meaning couriers will leave packages in a secure location or at a nearby post office if no one is home.

Placing an Order with Multiple Items To minimize costs, our delivery partners aim to deliver your entire order in a single shipment, meaning the delivery time will align with the item that has the longest delivery timeframe.

At Pets Area, we ensure customer satisfaction with a clear return policy. Returns due to change of mind are accepted within 30 days if items are unused, in original condition, and accompanied by proof of purchase. Perishable goods and personalized products are excluded. Faulty or damaged items reported within 30 days are eligible for replacements, exchanges, or refunds. Customers cover return shipping for change of mind, while Pets Area covers costs for faulty items. To initiate a return, contact us at info@petsarea.com.au. Follow the instructions provided for a smooth return process.

There are no reviews yet.

Be the first to review “Rogz Control Bungee Long Lead – Blue, XLarge”

Your email address will not be published. Required fields are marked *